Well more accurately 22 legs, (all the team have two each). On the first Thursday of the New Year a new attendance record for the Drainage team was achieved – all eleven of the team attending. A very cold but bright and sunny day; ideal for working off the excesses of the Christmas and New Year celebrations. (And for some stunning photos of steam trains with low sunlight highlighting the exhaust against a blue sky.)

But first, in Two Ronnies style, some late news from the end of last year.

Friday 27th December

Just before Christmas we were notified that the puddle under Didbrook No2 bridge was not receding, in fact the depth of water was around 1 foot. This was despite us clearing the gullies back in November – just another example of the wet autumn/winter we have experienced. So on Friday we dispatched the small locally based emergency response team (aka Jonathan) to attended. Using a small hand rake he cleared the gully where the down side high mileage cess drain enters the roadside, this was the source of the water. Then after fetching one of our new long handled three prong kebs, he went back and cleared the three gullies under the bridge. As the pipe on the down side is a perforated one, the air in the pipe blasted up through the ground and the up (Malvern) side drain creating impressive but short lasting fountains. After a quick sweep to clear the bigger debris, a request was put into to Gloucestershire Highways to attend with a sweeper truck.

Before (the picture that accompanied the report to us) .... [Photo by Mike Jaye]

... and after the initial cleanup. [Photo by Jonathan]

The small gullies which drain into the GCC roadside drains become clogged with debris quite easily. [Photo by Jonathan]
 

Thursday 2nd January

Nigel, Dave, and Martin formed the A team. They loaded up the blue Transit with brush cutters and the other tools required for culvert and cross drain clearance and examination. Destination was cross drain 30B by JJ Farms, accessing the trackside at Stanley Pontlarge. But first a stop at Tunnel Bridge (30) to offload two brush cutters for team C to use. The Transits are the better vehicles for carrying brush cutters, as fitting these into the back of either the Ranger or the Isuzu is tricky. Their designation as the A team was well earned – they cleared cross drains 30B, 31A and then the outlet of culvert 31B by Prestcott Road bridge. After short break for coffee and to let the first southbound train of the day pass, they resumed with clearance at Tirle Brook (the flume culvert 32A in Dixton Cutting) and finally cross drain 33A and culvert 33B at Gotherington Yard. Only then did teams B and C catch up with them!

Another location where our improvements have reduced the frequency and severity of flooding is the outlet of culvert 31B at Prescott Road bridge.

 

3850 heads the first southbound train of the day between bridges 30 and 31.

Team B was Jonathan, John, Roger and Polly. First job was to deliver a wheelchair to the First Response base at Toddington. Then on to Didbrook No2 bridge, as Gloucestershire Highways had not managed to find a sweeper truck to clean the road. All remaining mud on the carriage way was scraped up and barrowed away from the gullies. All the gullies were opened up and the small grab used to remove as much silt as possible from each.
The short grab was the ideal tool to remove silt from the roadside gullies at Didbrook No2 bridge. [Photo by Jonathan] 

A clean and almost dry road. [Photo by Jonathan]
Then they headed back to Winchcombe to offload the wheelbarrows and then on to Prescott Road bridge meeting up with team C. Here their first task was some clearance of the inlet ditches and gullies by the roadside of 31B.

Andrew, Peter, Ian and Stuart were team C. First task was at Tunnel Bridge to complete the clearance of culvert 30A (the up side outlet - the down side was cleared back in October) and it’s visual inspection. Then it was following behind team A to undertake the visual inspections of 30B, 31A, 31B, 32A, 33A and 33B. Plus with the combination of team B, all the up and down side cess chambers in Dixton cutting were cleared; plus some of the stream side vegetation alongside the Tirle Brook.

The Tirle Brook flowing strongly through culvert 32A. [Photo by Jonathan]

 
Documentary evidence of when the GWR or BR(W) made changes/improvements to our infrastructure are rare. However on the low mileage end of the down (Cotswold) side parapet of culvert 32A is cast  14-12-60; so this obviously dates from December 1960. The high mileage end has 14M-62C cast; its distance from Honeybourne.

7820 Dinmore Manor in Dixton Cutting approaching Tirle Brook culvert. We shall miss seeing her whilst away for the 10 year overhaul. But what a perfect day for the last run.
 

Finally all three teams met at Gotherington Yard, for a combined effort clearing and inspecting culvert 33B. This one has a section that runs under the road.

The inspection chamber of the under road portion of 33B just inside the boundary fence at Gotherington Yard. This is the area where some of the first excavations from Broadway platform 2 were used to raise the level. [Photo by Dave]
 

A unanimous decision was taken to return to the warmth of Churchward House mess for lunch. As the full team size (and their efficiency) had completed all the planned work; most of the team took a ride on the whole line starting with the 13:27 train from Winchcombe to Cheltenham with 3850 in charge. A useful exercise as this enables us to spot places where our attention is required, and to observe the progress of our vegetation contractor’s clearance operations, and how our neighbours at Little Buckland are getting on with their drainage operation. The largest construction site adjoining the Railway is at Pry Lane, with Severn Trent’s expansion of the sewage works there. Our diesel enthusiast member was pleased with the haulage from Broadway back to Winchcombe, the green class 37 (D6948).

Andrew carefully cuts a chocolate cake into equal slices watched by Nigel and Polly (right) whilst Dave (left) keeps an eye on the photographer. [Photo by Jonathan]


Wildlife report: A dark tortoiseshell cat made a rapid exit from the old wooden shed at Winchcombe as soon as we opened the door first thing. As we have not encountered any rodents in the shed, she is obviously doing a great job. We did spot a rodent at culvert 30A; but it made a disappearance too rapid for proper identification, so might have been a small mouse, or shrew, or vole (too big to be a rat). Otherwise it was mainly birdlife, the ubiquitous friendly robins (there is probably a resident at every culvert) and lots of gulls.

No comments:

Post a Comment