Friday, 20 November 2026

Misty

Thursday 19th November

A damp and misty day, with a sudden drop in temperature just after luncthime. It felt more like winter than autumn. So the gallant six members of the team worked efficiently to complete the days tasks. So much that our afternoon tea in Churchward House mess was just after 2pm! The six heroes were: Jonathan, Nigel, Peter, John, Martin (J) and Andrew.

Autumn mist on the up side at Gretton.

The tasks for the day were the clearance and visual inspection of cross drains 27A, 27C and culvert 27B, all between Gretton and Stanley Pontlarge. The down (Cotswold) side access to 27A and 27B is down the embankment bordering Townsend farm. This is the stretch of embankment that our Lineside Clearance colleagues have been working on. However, for these two structures, the access route is on the stretch they cleared last autumn, so we had to re-clear through the saplings, brambles, old man’s beard and other vegetation that has sprung up in the intervening twelve months.

We did benefit from the stretch that has been cleared this autumn. This allowed very easy access to where a small stream joins the high mileage toe ditch of 27B. On the up (Malvern) side we cleared down to the 27A exit, then along the boundary fence, past the 27B exit and beyond to where the 2021 installed toe drain pipes finish. All very damp, and at the high mileage end we discovered an extensive badger sett. There is even an entrance in the adjoining field.

The recently cleared down side embankment where the small stream that runs along the field boundary enters the toe ditch.

Nigel and John working on the up side toe ditch between 27A and 27B. [Photo by Jonathan]

The dribble of water entering the 28A inlet chamber at Stanley Pontlarge. [Photo by Jonathan]

Besides the culverts and cross drains, we cleared around marker posts and mile posts – also the top of the embankment on the up side by milepost 13¾ to create another area where we can safely park vehicles.

As usual with the check on 28A, we removed some silt from the exit chamber which is near the main road, outside of railway property. This is another essential regular task to prevent the outlet under the road backing up. Another sign of the dry summer was that the amount of silt here was much less than usual. That hot, dry summer is very much a memory now. All the watercourses we inspected today were flowing, a couple quite steadily. Quite a bit of the water comes from springs on the hill above Stanley Pontlarge.

Jonathan, Martin(J), John and Peter on the silt removal from 28A exit.

Wildlife report: On the way to Gretton we encountered a family of roe deer on the vacant trackbed. Pheasants were everywhere, so too numerous wood pigeons. We heard buzzards, but the low mist made visual contact impossible. As ever, the resident robin at each culvert was soon inspecting the cut vegetation. Not quite wildlife, but worth noting were a ginger and white cat at Gretton and black and white cat in Winchcombe Yard. The later is yet another hazard for the yard’s resident robins.

2 comments: