Friday, 20 November 2026

Misty

Thursday 19th November

A damp and misty day, with a sudden drop in temperature just after luncthime. It felt more like winter than autumn. So the gallant six members of the team worked efficiently to complete the days tasks. So much that our afternoon tea in Churchward House mess was just after 2pm! The six heroes were: Jonathan, Nigel, Peter, John, Martin (J) and Andrew.

Autumn mist on the up side at Gretton.

The tasks for the day were the clearance and visual inspection of cross drains 27A, 27C and culvert 27B, all between Gretton and Stanley Pontlarge. The down (Cotswold) side access to 27A and 27B is down the embankment bordering Townsend farm. This is the stretch of embankment that our Lineside Clearance colleagues have been working on. However, for these two structures, the access route is on the stretch they cleared last autumn, so we had to re-clear through the saplings, brambles, old man’s beard and other vegetation that has sprung up in the intervening twelve months.

We did benefit from the stretch that has been cleared this autumn. This allowed very easy access to where a small stream joins the high mileage toe ditch of 27B. On the up (Malvern) side we cleared down to the 27A exit, then along the boundary fence, past the 27B exit and beyond to where the 2021 installed toe drain pipes finish. All very damp, and at the high mileage end we discovered an extensive badger sett. There is even an entrance in the adjoining field.

The recently cleared down side embankment where the small stream that runs along the field boundary enters the toe ditch.

Nigel and John working on the up side toe ditch between 27A and 27B. [Photo by Jonathan]

The dribble of water entering the 28A inlet chamber at Stanley Pontlarge. [Photo by Jonathan]

Besides the culverts and cross drains, we cleared around marker posts and mile posts – also the top of the embankment on the up side by milepost 13¾ to create another area where we can safely park vehicles.

As usual with the check on 28A, we removed some silt from the exit chamber which is near the main road, outside of railway property. This is another essential regular task to prevent the outlet under the road backing up. Another sign of the dry summer was that the amount of silt here was much less than usual. That hot, dry summer is very much a memory now. All the watercourses we inspected today were flowing, a couple quite steadily. Quite a bit of the water comes from springs on the hill above Stanley Pontlarge.

Jonathan, Martin(J), John and Peter on the silt removal from 28A exit.

Wildlife report: On the way to Gretton we encountered a family of roe deer on the vacant trackbed. Pheasants were everywhere, so too numerous wood pigeons. We heard buzzards, but the low mist made visual contact impossible. As ever, the resident robin at each culvert was soon inspecting the cut vegetation. Not quite wildlife, but worth noting were a ginger and white cat at Gretton and black and white cat in Winchcombe Yard. The later is yet another hazard for the yard’s resident robins.

Friday, 13 November 2026

Two and six

Thursday 12th November

No, not 12½p in old money, but today’s group sizes.

Jonathan and Ian were the “two”. They spent the day working on regular servicing and not so regular maintenance on our road vehicle fleet. Most of the day was occupied with sorting out a charging problem with the batteries on the white tipper Transit. This involved checking the batteries, and to do that you need to remove the drivers seat. They took the Transit and the white Ranger for test runs, long enough to get the engine warm. That is something that barely happens in normal use on the Railway.

The “six” were Nigel, Dave, Stuart, Martin (J), John and Andrew. The progressed the annual programme of culvert and cross drain visual inspections and clearance. Nigel, Dave and Stuart first tackled 25A at Working Lane bridge and the outlet ditch that runs at the toe of the up side embankment from 25B. Meanwhile, Martin (J), John and Andrew saw to some odd jobs on 24A, 24B and 24C which we had spotted last week.

John clearing silt and debris from the brick invert channel of 25A under Working Lane bridge.
Martin(J) at the outlet of 25B (the ditch in the foreground). [Photo by Dave]
 

After coffee break, all six resumed work on 25A and the 25B outlet. Stuart also cleared along the fence line by the farm track and the bases of the bridge wing walls.

Dave and Martin (J) at the headwall where the 25B exit ditch goes underground to a junction with 25A.
One of the tasks at 25A is to polish the Michael Beveridge memorial plaque on the 25B junction inlet headwall. Michael build that structure six years ago. [Photo by Dave]

Lunch was taken in a carefully selected spot, in the sunshine but out of the wind. After lunch the targets were the down side of 25B and the up side exit of 25C. The down side inlet of 25C is outside of railway land.

Nigel prepares to cut the access path down to the outlet of 25C.

Wildlife report: Definitely a bird watching day. During the lunch break at Working Lane we noted three raptors, (red kite, buzzard, kestrel), crows mobbing the kestrel, a heron, magpies, a wren and long tailed tits. As usual, where ever we clear vegetation, a robin soon comes to investigate. Speaking of robins, we can confirm that the very friendly robin at Winchcombe yard that is brave enough to enter the Forestry container (and the some other containers) is not one of the pair that nest in the old wooden shed. So the yard is divided into at least two territories.

Friday, 6 November 2026

Heading South

Thursday 5th November

Three groups of three today, all heading vaguely south from Winchcombe.

Martin (J), Dee, and Peter departed promptly the short distance to the cutting leading to the low mileage portal of Greet Tunnel. Here they cleared the vegetation around the cess chambers on both sides of the line between Greet Road bridge and the tunnel. They also cleared around the crest chambers by the boundary fence on the down (Cotswold) side. The reason for the prompt departure was an attempt to get this task completed before the arrival of a photo charter train. Unfortunately the photo charter also was on an early start. Hence some shenanigans to keep orange hi-vis cloaked folk out of the way of pictures of a BR black locomotive and ‘blood & custard’ carriages.

Jonathan, Phil and John headed further south, to Two Hedges Road at Bishops Cleeve. Their job was to prune the vegetation that was growing on the narrow bits of railway land between the road bridge (40) and the footbridge (39Z). That on the roadside was beginning to impinge on the carriageway.

Before trimming - north (Malvern) side of Two Hedges Road. [Photo by Jonathan]
Phil on traffic management duty. [Photo by Jonathan]

After trimming - the south (Cotswold) side of Two Hedges Road. [Photo by Jonathan]

Nigel, Dave and Andrew were the third group, their destination was Working Lane. First task was clearing around the cess chambers and the two crest chambers between the top of the haul road by the Royal Oak and the high mileage portal of Greet Tunnel. Next it was clearing around the two chambers and one headwall of culvert 24A – this one is due for a detailed inspection later in the year by our external consultants. Then whilst Dave and Andrew attended to the down side inlets of cross drain 24B and culvert 24C, Nigel tackled the very overgrown outlet of 24B.
The photo charter train did not venture south of Greet Tunnel, so only a crest chamber in this picture! [Photo by Dave]

The intermediate chamber of 24A. All that vegetation has grown up in the 18 months since we built this structure.
The access down the embankment to the 24C inlet - the tree growth prevents brambles and other undergrowth establishing here.

Ma
rtin (J), Dee, and Peter came over from the other end of the tunnel in time for lunch. After lunch, all six finished off the clearing on 24B outlet ditch and then worked on the outlet of 24C, This includes the long ditch leading to the grill under the boundary fence. Access to that is now more difficult, as a lot of the debris recently cleared from the old garden centre at Toddington has now migrated to the area at the foot of the haul road.
Peter in the deep outlet ditch of 24B.

Our old friend the final outlet grill of 24C! But this is the lowest water level we have ever seen here - it is below the level of the outlet pipe.

Peter demonstrates just how low the water is by standing in the 24C outlet ditch by the exit grille. [Photo by Dave]
A bit further back up the ditch, Martin (J) rakes out the cut vegetation. [Photo by Dave]

Wildlife report: For a dull, damp, grey and chilly day typical of November, we saw a surprising variety of wildlife. First was a very close encounter with the friendly robin in Winchcombe Yard – he/she even being brave enough to investigate the inside of the Forestry container. Not quite so tame were a pair of magpies. At Gretton, more robins were attracted by our work. We also spotted some gold finches and a sparrow hawk. On the ground, we had a fleeting glimpses of a weasel and a muntjac deer. The recent wet spells have resulted in some significant fungi growth; including some large flat topped specimens growing in the centre of the vacant trackbed.