Saturday, 23 November 2019

More culvert clearing


Saturday 23 November 

The forecast was for rain today, but once again it was wrong, we managed to stay dray and the rain only started as we left for home. As the ground is very wet it was a case of picking an area to clear where there wasn't too many steep gradients, a rather difficult thing on this railway. In the end we headed for Gotherington to work along through Dixton cutting. With 4 of us working today, it meant that we could make some good progress. Plus there was time for some more chambers to be catalogued. 

Gotherington Yard, Culvert 33B down side 
Culvert 33B up side 
Alastair clears the cuttings from the up side of 33B 
Roger and Dave clearing the down side of 33B 
Gotherington yard even got a trim
Permanent Way gang working in the background 
Culvert 33B down side ditch and headwall 
Culvert 33B inlet end headwall and chamber 
Culvert 33B water trickling in from the pipe under the yard (on left side)

Next one up was Culvert 33A, another recent rebuild on the down side. 

Culvert 33A down side, Dave brushcutting along the side 
Culvert 33A down side, Alastair looking at the silt deposits 
Roger removes the silt with the gully grab
(Photo: Alastair) 
You missed a bit 😒
(Photo: Alastair) 
Culvert 33A up side chamber, Alastair reaching for his camera 
33A up side, Stuart dipping for the depth. without dropping the stick in 😃
(Photo: Alastair) 

There was a suspicion that a plank had gone missing when the down side of 33A was rebuilt a couple of years ago. Alastair found it today! 

Culvert 33A up side chamber, with plank stuck in the outlet
(Photo: Alastair) 

The chambers along this stretch have a top course of common bricks, as opposed to engineering bricks, these don't survive well in the wet and frost 

Down side chamber with disintegrating brick top course 
Chamber with mortar joints washed out 



The chambers were cleared of vegetation as we moved further into Dixton Cutting. 

Working along to the three arch bridge at Dixton 


Culvert 32A carries Tirle Brook under the railway on it's way to join the River Swillgate at Tewkesbury. It takes a long winding path to get there. 


Culvert 32A down side inlet flume 
Culvert 32A up side outlet stream 
Dave working his way up the down side
(Photo: Alastair) 
Roger takes on the up side
(Photo: Alastair) 
Dave reaches the top of the flume 
Dave and Alastair clearing the inlet stream 
Alastair and Roger on the up side 
Culvert 33A down side inlet flume 
33A down side finished 
Culvert 33A up side stream abandoned until the water level drops 

The up side drainage channel was fitted with a pipe back in June 2017, it's still working well. 

End of the piped up side channel drain
(Photo: Alastair) 

The area on the down side crest where the water flooded in from the filed was cleared, it's planned to dig out the crest ditch along here so being able to see the ground will help 

Dixton cutting down side crest 
Stuart running the flail along the down side crest
(Photo: Alastair)
Dixton cutting down side crest cricket pitch 

Last on the list today was Culvert 31B under Bridge 32 at Prescott Road. This has a very short brick channel that is full of silt, probably because it runs out under the hedge and into a 6" pipe throttling the flow. 

Culvert 31B up side (on the right) from Prescott Road Bridge 
Roger attacking the Old Man's Beard
(Photo: Alastair) 
West wall of the brick channel has a displaced top 
Culvert 31B up side brick arch 
Culvert 31A, up side fence needs replacing 
Culvert 31A up side now visible 
Bridge 32 up side west wing wall cleared by Dave 

While in the area the turning point was cleared, it helps to find the hard bits so we can avoid getting stuck 😉

Bridge 32 vehicle turning point 

On the way back out we checked the small chamber on the fence line that carries the cess drain to Culvert 33B, it looks like it's had an argument with the robot flail. 

Dave picks up the bricks knocked off the fenceline chamber 



Friday, 22 November 2019

Culvert clearance progress

Thursday 21 November

Strange how plans change as the day goes on, we ended up clearing 7 culverts today. The 3 around Didbrook No 2 bridge are fairly flat so that makes the going a bit faster. Culvert 17A at Hailes is long and 14B at Didbrook No 1 is steep so that compensates for the easy ones. Not much else to report, it's mainly pictures of vegetation 😊 

However, there is some good news regarding culvert clearance; we have just passed the half way mark; only another 38 to go. We were ahead of normal but have been hit by the weather during November. With a week to go before the end of the month we might be able to do some catching up.  

Culvert clearance progress 2019 

The contractors working on the River Isbourne were doing a relay with the diggers to fill the gabion baskets. Strangely, it was quite addictive to stand watching, we even came back to watch on the way home. 

Morning stop to see the contractors at Culvert 21A 

First culvert to receive attention was 14A just south of Toddington Signal box. 

Culvert 14A down side, before Michael 
Michael finds the chamber on the down side 

We have yet to find the up side end of 14A, it's somewhere in the North Cotswolds Narrow Gauge site, we have a rough idea where it should be but no water ever appears on that side. 

Alastair, Roger and Dieh looking for 14A outlet 
Culvert 14A down side 
Culvert 14A inlet, it's a 4" pipe, no wonder it floods in the field 

We clear round the mileposts as we pass them, that is if we spot them 😉

10 miles, seen better days 

Culvert 14B saw the brunt of the floods, a bridge up stream was partly washed out and luckily the sleeper deck got caught up on the inlet end. 

Culvert 14B down side, Roger reaches the toe 
Culvert 14B  down side with added sleeper
(Photo: Alastair) 
The farmer's bridge that washed out 
A bridge and a half
(Photo: Alastair) 
A sleeper left in the footbridge for the farmer to recover 
Culvert 14B down side headwall
daylight visible from the outlet, a good sign 
Culvert 14B up side, Michael blazes a trail down 
Culvert 14B up side headwall almost 
Alastiar carrying out the visual inspection 
Culvert 14B up side after clearing 

The vegetation must be getting tougher this year, one of our top operatives broke the loppers on an ash twig 😖

Stihl Pruning Shears, engineered for strength! 

Culvert 15A, between Didbrook 1 and Didbrook 2 was next on the list.

Roger at Culvert 15A down side 
Michael and Alastair on 15A up side 

Further round over Didbrook 2 bridge, the three 16 series culverts were cleared. 

Dieh and Alastair cutting back Buddleja to clear the service road 
Stuart cut a path up the wing wall of Didbrook 2 bridge
to facilitate access if there's another flood 
Roger clearing towards Culvert 16A down side 
Culvert 16A down side 
Michael immersed in Culvert 16B down side
(Photo: Alastair) 
Culvert 16B down side 
The floods in the fields have almost cleared 
Culvert 16C down side 
Culvert 16C up side headwall 
Culvert 16C down side headwall 

On the way round by Hayles Abbey Halt we cleared the cess chambers, mainly on the down side as the up hadn't overgrown. There's a bit of GWR confusion around Hailes the abbey and hamlet and Hayles Abbey Halt the station. Evidently someone at Swindon years ago decided it needed a different spelling.  

Hailes down side, a cess chamber 
Hailes down side, chamber uncovered 
The gang playing leapfrog from chamber to chamber 
The concrete eating robot vegetation flail has been round here 
Lids dropped in, probably by the flail contractor 
Alastair clearing up after the brushcutter team 

Last one for today, Culvert 17A, this one is not too steep, but it's long to make up for it. 

Culvert 17A downs side on arrival 
Culvert 17A down side, Stuart brushcutting
(Photo: Alastair) 
Dieh raking clear on Culvert 17A down side
Roger clearing the headwall on Culvert 17A up side
(Photo: Alastair) 
Alastair clearing off Culvert 17A up side 

There was an empty stock move today, the 73 (E6036) came up with 10 carriages from Winchcombe, it's all about getting ready for the Santa trains.  

Class 73 E6036 with a load 
Culvert 17A up side after clearing 
Culvert 17A down side after clearing 
Culvert 17A down side headwall 

After that it was back to base at Winchcombe, with a stop off to watch to the diggers at work...