Monday 17 June
There was a break in the weather today, the rain stopped long enough for some work to be done. The water level in Culvert 11A has dropped significantly making it a bit easier to work, the south wall is well above the flow. Another landmark today was the arrival of a welfare cabin; before all the comments start flying around, it's a legal requirement to provide welfare facilities on site, there's no getting round it without risking a fine or worse. Admittedly, it is much more civilised for shelter from the weather than all cramming into the truck 😏
 |
| Cabin delivered by Welfare4Hire |
Carley, from Welfare4Hire skilfully negotiated the slalom onto the hard-standing to position the cabin in line with the morning sun. We may need to pave the patio area next 🤭
There was another sand and brick delivery first thing, luckily Alastair spotted the wagon waiting at the gate on his way in so he opened up for the unloading.
 |
| More sand and bricks, that's going to keep us busy |
Roger continued with the south wall build. As this wall is now straight, it's highlighting flaws in the north wall.
 |
| Backbreaking work |
Nigel and Stuart took on the challenge of uncovering the inlet pipe. After much consideration, we have deduced that this is not the original GWR culvert inlet 🙂
 |
| Nigel uncovering another lump of concrete |
Dave took charge of the brick cleaning station, it's a key job as the bricks are going straight back into the facing on the south wall
 |
Dave hard at work (Photo: Alastair) |
At morning break, the gang took time out to test the facilities in the welfare cabin, all we need now is pack of cards and television.
 |
| Luxury! |
Then it was back to the proverbial coalface...
 |
More headers going on (Photo: Alastair) |
 |
Stuart and Nigel digging for gold (Photo: Alastair) |
 |
Dave moved over to dig out the gully drain trench (Photo: Alastair) |
 |
Next course of recycled stretchers added (Photo: Alastair) |
The recent high water has done us one favour, the water in the culvert is now running level. The obstructions have been washed out.
 |
| Culvert 11A brick arch internal (down to up side) |
The excavation around the inlet pipe has allowed us to re-route the water from the down cess. It's now channelled under the twinwall pipe away from the wing wall foundations.
 |
| Inlet pipe exposed |
 |
| Roger on the bricks, Alastair digging out the gully trench |
 |
| Down side cess running in under the twinwall |
 |
| Supervision is key |
 |
| Gully pipe removed to clear the trench |
Roger is not in on Thursday so he built the pattern for the next 3 courses ready for Michael. It may be proved that he was being a touch ambitious expecting all this to get done 🙃
 |
| Pattern for the remaining courses |
There was a question on the last edition about taper bricks; these are used to build round an arch, they are thinner along one side so that they form a circle (as below). They are produced in 4 sizes for different diameter structures. The culvert has a mix of tapers and straight solids to form the 24" arch. The channel is just like the arch but upside down.
 |
| Brick Arch, taper bricks form the shape |
 |
The end of the north wall mix of straight and taper bricks |
Good progress today, with the forecast looking promising for Thursday we hope to get even more done.
 |
| Culvert 11A down side |
 |
| Culvert 11A up side |